Take Retirement Easy
  • Investing
  • Stock
  • Latest News
  • Editor’s Pick
Enter Your Information Below To Receive Free Trading Ideas, Latest News And Articles.

    Your information is secure and your privacy is protected. By opting in you agree to receive emails from us. Remember that you can opt-out any time, we hate spam too!
    Popular Topics
    • In a SNAP, Trump blamed for blocking food assistance to low-income families
    • Questcorp Mining Provides Clarification on Private Placement Investment
    • Trump pardons Rudy Giuliani, Mark Meadows, Sidney Powell, others involved in 2020 election interference saga
    • Juggernaut Confirms District Scale Gold-Rich System on Big One Property Measuring 22 km2 with Assays up to 263.70 g/t AuEqthat is Drill Ready, Golden Triangle, B.C.
    • Upcoming Meeting Dates – November 10, 2025
    • About us
    • Contacts
    • Privacy Policy
    • Terms and Conditions
    • Email Whitelisting
    Take Retirement Easy
    • Investing
    • Stock
    • Latest News
    • Editor’s Pick
    • Investing

    Juggernaut Confirms District Scale Gold-Rich System on Big One Property Measuring 22 km2 with Assays up to 263.70 g/t AuEqthat is Drill Ready, Golden Triangle, B.C.

    • November 10, 2025

    (TheNewswire)

    Vancouver, British Columbia TheNewswire – November 10, 2025 Juggernaut Exploration Ltd (JUGR.V) (OTCPK: JUGRF) (FSE: 4JE) ( the ‘Company’ or ‘Juggernaut’) is excited to announce that detailed mapping and sampling have confirmed that the gold-rich Big Mac Zone, Whopper Zone and Gold Dome Zone all form part of the 22 Km 2 district-scale Eldorado System that remains wide open where grab samples assayed up to 263.70 gt AuEq or 8.48 ozt AuEq and channel cuts assayed up to 4.89 gt AuEq over 5.21 m from >400 mineralized veins that are up to 10 m wide hosted in shear zones up to 50 m wide, and are exposed on surface for >1 km with >1 km of vertical relief, remains open and is drill ready on the Big One property (the ‘Property’), Golden Triangle, British Columbia. In addition, based on excellent assay results, the Company has acquired additional claims and expanded the Gold Swarm discovery area of strong gold potential from 1 km 2 to 3 km 2 and 700 m of vertical relief and remains open, effectively tripling this area of strong gold potential, where grab samples assayed up to 231.81 gt AuEq or 7.45 ozt AuEq and channel cuts assayed up to 4.51 gt AuEq over 4.36 m that remains open and is drill ready. The Big One discovery is located in an area of recent glacial and snowpack abatement adjacent to the Tier 1 gold-rich porphyry systems, the likes of Galore Creek. The 100% controlled Big One property covers 39,271 hectares of geological terrane with tremendous additional discovery potential.

    Link to map with samples > 1 g/t AuEq

    Big One Gold Rich District Scale System Highlights:

    The district-scale Eldorado System covers an area ~half the size of the Island of Manhattan (22 km ) that remains wide open where grab samples assayed up to 263.70 g/t AuEq or 8.48 oz/t AuEq and channel cuts assayed up to 4.89 g/t AuEq over 5.21 m from 400 mineralized veins that remain open and are up to 10 m wide, the equivalent to ~3-story building, hosted in shear zones up to 50 m wide, comparable to a 15-story building, and are exposed on surface for 500 m, or 5 football fields, with 1 km of vertical relief, the height of 2.5 Empire State Buildings.

    Link to Gold Dome Figure

    Link to Whopper Zone Figure

    The Gold Swarm Area of strong gold potential has been expanded from 1 km to 3 km , equivalent to more than the downtown core of Vancouver B.C, with 700 m of vertical relief and remains wide open, with 100 veins up to 4.5 m wide, the equivalent of a 1.5-story building, and exposed on surface for 200 m equivalent to 2 football fields and remain open containing grab samples that assayed up to 231.81 g/t AuEq or 7.45 oz/t AuEq a nd channel cuts that assayed up to 4.51 g/t AuEq over 4.36 m. The Gold Swarm Area is drill ready.

    Link to Goldswarm Figure

    41% (219 samples out of 527) collected within the Eldorado System in 2024 and 2025 assayed 1 g/t AuEq; 65% (28 samples out of 43) collected withing the Gold Swarm Zone in 2024 and 2025 assayed 1 g/t AuEq.

    Grade (AuEq)

    >1 g/t

    >3 g/t

    >5 g/t

    >10 g/t

    >15 g/t

    >20 g/t

    >30 g/t

    >60 g/t

    >90 g/t

    Samples

    219

    129

    95

    66

    51

    40

    23

    8

    5

    Gold samples up to 256.60 g/t or 8.25 oz/t, silver samples up 2810 g/t or 90.34 oz/t, and copper samples up to 14.40 % were collected on Big One.

    Detailed mapping has confirmed common orientations as well as similar geochemical signatures and textures of the gold-mineralized veins along the 15 km Highway of Gold corridor surrounding the snowcap of Deeker Glacier, strongly indicating that the gold-rich mineralization found throughout is all part of one huge district-scale gold system that remains wide open.

    The polymetallic veins, alteration signature, geochemical pathfinder element signature, and geophysical anomalies strongly indicate the presence of a large common buried gold-silver-copper rich porphyry feeder source or similar magmatic source or sources at depth responsible for the extensive high-grade veining confirmed on surface over 22 km

    The company recently received a 5-year property-wide advanced exploration drill permit.

    Detailed geological and structural mapping has been completed on the reported drill targets in order to define the full geometry of these high-grade gold-bearing shears and veins and will be instrumental in designing the drill plan for the upcoming maiden drill program.

    A high-resolution UAV photogrammetry survey was completed over an area of 52 km2 on the Eldorado System and Gold Swarm Zone encompassing all of the maiden drill targets. The data will be used to support modelling and define targeting the high-grade gold mineralization recently discovered.

    A property wide LiDAR survey covering an area of 385 km has been conducted and will be used to augment information obtained from the mapping as well as plan the upcoming inaugural drill campaign.

    Multiple drill-ready targets have been confirmed and are planned to be tested in the fully funded inaugural drill program and include but are not limited to: the 22 km Eldorado System hosting the Gold Dome Zone where grab samples assayed up to 263.70 g/t AuEq or 8.48 oz/t AuEq; the Big Mac Zone where grab samples assayed up to 113.92 g/t AuEq or 3.66 oz/t AuEq; the Whopper Zone where grab samples assayed up to 43.94 g/t AuEq or 1.41 oz/t AuEq; and the Gold Swarm Area where grab samples assayed up to 231.81 g/t AuEq or 7.45 oz/t AuEq.

    Juggernaut is working in consultation with the Tahltan First Nation and the local community and is committed to maintaining respectful and collaborative relationships. As we advance exploration on our project, we will continue working closely with the Tahltan First Nation and all the local stakeholders and regulatory agencies to ensure our activities create long-term value and reflect community priorities.

    Dan Stuart, President and CEO of Juggernaut Exploration states: ‘With a district-scale discovery of this magnitude host to so many large gold-rich veins and shears exposed on surface that rise above the valley floor for >1 km we are likely only seeing the tip of the iceberg on this mountain of gold. We look forward to the fully funded maiden drill program on this remarkable gold discovery with much anticipation. The best is yet to come!’

    Manuele Lazzarotto, PhD, Chief Geologist of Juggernaut Exploration, states: ‘With the advanced exploration permit in hand, we look forward to unlocking the full potential of the Big One gold discovery in the third dimension during the inaugural drill program. Once we receive, compile, and interpret all the deliverables from the detailed and regional mapping, UAV orthophotos survey, and LiDAR survey, the same team responsible for the Tier 1 Surebet gold discovery will design and execute the maiden drill program. Obvious opportunities with the scale and grades seen on Big One are extremely rare, and we have clearly barely begun to scratch the surface. The team looks forward to testing this remarkable discovery at depth.’

    Table 1: Samples from 2024-2025 with assays >1 g/t AuEq

    Sample ID

    Year

    Sample Type

    Au (g/t)

    Ag (g/t)

    Cu (%)

    Pb (%)

    Zn (%)

    AuEq (g/t)

    M224886

    2025

    Float

    256.60

    546.00

    0.43

    0.41

    0.01

    263.70

    M217656

    2025

    Float

    226.94

    335.00

    0.00

    4.99

    0.01

    231.81

    D751423

    2025

    Grab

    138.70

    29.96

    0.08

    0.02

    0.02

    139.14

    M220659

    2025

    Grab

    111.35

    159.00

    0.02

    3.88

    0.01

    113.92

    M224956

    2025

    Grab

    95.04

    49.60

    0.02

    0.02

    0.01

    95.67

    D751282

    2024

    Grab

    79.01

    58.90

    0.13

    0.43

    0.80

    80.08

    D751407

    2025

    Grab

    68.57

    115.00

    0.35

    1.25

    6.53

    72.02

    D751424

    2025

    Grab

    60.08

    9.57

    0.01

    0.00

    0.01

    60.21

    D751966

    2024

    Grab

    56.54

    23.30

    0.03

    0.02

    0.03

    56.84

    M220561

    2025

    Grab

    55.50

    38.62

    0.09

    2.02

    0.44

    56.47

    M217807

    2025

    Channel

    47.18

    156.00

    0.01

    9.28

    0.07

    50.57

    D750642

    2025

    Grab

    43.99

    102.00

    0.00

    9.19

    0.44

    46.79

    M217601

    2025

    Channel

    39.84

    333.00

    0.02

    0.07

    0.06

    43.94

    M217579

    2025

    Channel

    34.96

    415.00

    0.02

    21.13

    0.06

    43.38

    D751216

    2024

    Grab

    37.98

    75.50

    0.24

    5.72

    3.93

    41.46

    D751191

    2024

    Channel

    12.12

    2810.00

    0.02

    8.04

    0.00

    37.20

    D751156

    2024

    Grab

    33.72

    177.00

    0.27

    2.71

    0.27

    36.11

    D751357

    2025

    Grab

    18.06

    333.00

    12.05

    0.00

    0.14

    32.65

    M217613

    2025

    Channel

    31.68

    9.40

    0.16

    0.00

    0.10

    31.96

    M224961

    2025

    Grab

    31.25

    13.98

    0.39

    0.00

    0.00

    31.77

    D750638

    2025

    Grab

    14.46

    621.00

    0.11

    54.39

    0.44

    30.79

    D751375

    2025

    Grab

    28.47

    70.39

    0.15

    2.43

    0.40

    29.94

    D751402

    2025

    Grab

    29.23

    11.44

    0.17

    0.01

    0.00

    29.52

    D751373

    2025

    Grab

    21.44

    172.00

    0.07

    15.92

    6.21

    27.59

    D751964

    2024

    Talus

    23.47

    110.00

    1.37

    0.01

    0.00

    26.07

    D750389

    2024

    Grab

    8.10

    1420.00

    1.11

    0.15

    2.70

    26.01

    D751163

    2024

    Float

    23.97

    116.00

    0.02

    2.16

    0.13

    24.53

    D750639

    2025

    Grab

    18.12

    174.00

    3.36

    2.91

    0.03

    23.63

    M217567

    2025

    Channel

    17.00

    461.00

    0.04

    0.87

    0.31

    22.86

    D750624

    2025

    Grab

    21.62

    45.06

    0.00

    2.33

    0.16

    22.58

    M217705

    2025

    Channel

    20.78

    48.45

    0.62

    2.37

    1.05

    22.53

    M224905

    2025

    Talus

    9.48

    646.00

    5.48

    0.05

    0.05

    22.15

    M224982

    2025

    Chip

    21.17

    20.30

    0.02

    0.92

    0.03

    21.58

    M217655

    2025

    Grab

    19.64

    15.34

    0.00

    1.37

    2.93

    20.74

    M224983

    2025

    Grab

    14.06

    191.00

    0.15

    17.27

    4.50

    20.31

    D751365

    2025

    Grab

    9.35

    566.00

    0.01

    25.22

    0.06

    20.24

    M217657

    2025

    Grab

    18.11

    88.95

    0.00

    2.08

    0.01

    19.53

    D750621

    2025

    Grab

    3.76

    223.00

    14.45

    0.00

    0.11

    19.09

    D750644

    2025

    Grab

    18.47

    12.54

    0.00

    0.89

    0.01

    18.77

    D750625

    2025

    Grab

    18.32

    6.19

    0.01

    0.01

    0.55

    18.54

    D751374

    2025

    Talus

    16.60

    66.43

    0.38

    1.82

    0.60

    18.17

    D750641

    2025

    Grab

    15.52

    55.65

    0.63

    1.85

    0.08

    17.06

    M224959

    2025

    Grab

    15.94

    16.54

    0.00

    0.01

    0.01

    16.15

    D750394

    2024

    Grab

    13.12

    163.00

    0.51

    1.65

    0.42

    16.04

    M217852

    2025

    Channel

    15.39

    20.95

    0.04

    1.02

    0.37

    15.93

    M217649

    2025

    Channel

    14.96

    22.24

    0.41

    0.64

    0.95

    15.92

    D751285

    2024

    Grab

    3.74

    91.20

    7.96

    0.01

    0.01

    13.18

    D751975

    2024

    Grab

    10.62

    198.00

    0.00

    0.77

    0.01

    13.10

    D750192

    2024

    Grab

    3.44

    220.00

    6.61

    0.00

    0.01

    12.91

    M224932

    2025

    Grab

    0.00

    755.00

    0.63

    6.07

    7.28

    12.43

    D750852

    2025

    Subcrop

    1.07

    860.00

    0.01

    2.12

    1.32

    12.20

    M220602

    2025

    Grab

    11.92

    2.04

    0.01

    0.00

    0.04

    11.96

    M224883

    2025

    Grab

    11.07

    20.98

    0.03

    0.01

    0.00

    11.36

    D751943

    2024

    Grab

    4.00

    128.00

    0.30

    15.35

    8.35

    11.32

    D750198

    2024

    Float

    6.01

    34.10

    0.14

    0.04

    15.30

    11.21

    M217784

    2025

    Channel

    10.83

    1.88

    0.00

    0.00

    0.04

    10.87

    D750704

    2025

    Grab

    2.59

    325.00

    0.35

    22.97

    1.56

    10.83

    D750608

    2024

    Grab

    10.62

    3.20

    0.00

    0.01

    0.01

    10.67

    M217785

    2025

    Channel

    10.17

    1.97

    0.00

    0.00

    0.01

    10.20

    M224957

    2025

    Grab

    9.65

    15.14

    0.03

    0.18

    0.48

    10.00

    D751154

    2024

    Grab

    5.72

    218.00

    0.22

    1.81

    1.34

    9.20

    D751969

    2024

    Float

    5.59

    185.00

    0.40

    1.91

    0.98

    8.82

    D751284

    2024

    Float

    6.34

    47.70

    0.03

    6.78

    0.59

    8.66

    D751151

    2024

    Float

    2.79

    474.00

    0.01

    20.00

    1.22

    8.59

    D751192

    2024

    Channel

    3.39

    366.00

    0.01

    0.11

    0.00

    7.68

    D751372

    2025

    Grab

    7.44

    16.56

    0.00

    0.17

    0.01

    7.67

    D751104

    2024

    Float

    3.79

    204.00

    0.30

    4.60

    1.12

    7.54

    D750395

    2024

    Grab

    6.01

    105.00

    0.01

    0.06

    0.09

    7.42

    D750643

    2025

    Grab

    7.36

    2.04

    0.00

    0.03

    0.02

    7.40

    M217571

    2025

    Channel

    6.06

    89.91

    0.04

    0.01

    0.67

    7.35

    M220559

    2025

    Grab

    1.55

    262.00

    0.01

    13.83

    0.08

    6.94

    M220601

    2025

    Grab

    6.77

    5.19

    0.08

    0.00

    0.01

    6.91

    M224865

    2025

    Grab

    0.05

    213.00

    4.32

    0.07

    0.48

    6.53

    M217589

    2025

    Channel

    5.81

    19.08

    0.35

    0.37

    0.28

    6.48

    D751403

    2025

    Float

    6.13

    14.47

    0.00

    0.02

    0.01

    6.31

    D751368

    2025

    Talus

    6.09

    6.80

    0.01

    0.25

    0.04

    6.24

    D751433

    2025

    Grab

    0.03

    139.00

    2.99

    4.42

    4.65

    6.13

    D751369

    2025

    Grab

    4.97

    71.63

    0.02

    1.44

    0.07

    6.10

    D751939

    2024

    Channel

    5.06

    96.30

    0.00

    0.05

    0.03

    6.10

    M217566

    2025

    Channel

    4.40

    118.00

    0.02

    0.13

    0.22

    5.93

    D751107

    2024

    Float

    4.09

    71.80

    0.22

    1.20

    0.95

    5.71

    D751112

    2024

    Float

    4.94

    59.50

    0.00

    0.31

    0.02

    5.70

    M217702

    2025

    Channel

    4.30

    38.77

    0.58

    2.16

    0.10

    5.64

    M224981

    2025

    Grab

    5.31

    13.36

    0.01

    0.69

    0.04

    5.60

    D751435

    2025

    Grab

    5.19

    10.98

    0.00

    0.54

    0.20

    5.46

    D751158

    2024

    Grab

    4.60

    30.70

    0.04

    1.36

    0.02

    5.31

    M220673

    2025

    Grab

    0.00

    345.00

    0.03

    0.45

    4.17

    5.29

    M217648

    2025

    Channel

    4.69

    7.08

    0.26

    0.44

    0.43

    5.17

    M217788

    2025

    Channel

    5.15

    1.29

    0.01

    0.01

    0.00

    5.17

    D750657

    2024

    Grab

    3.71

    40.80

    0.76

    0.01

    0.02

    4.98

    M220603

    2025

    Grab

    0.39

    313.00

    0.26

    1.50

    1.07

    4.92

    D751215

    2024

    Grab

    2.96

    102.00

    0.04

    0.04

    2.15

    4.84

    D750094

    2024

    Grab

    0.02

    108.00

    1.01

    0.06

    8.60

    4.83

    D750632

    2025

    Float

    4.44

    20.01

    0.02

    0.74

    0.01

    4.83

    D750656

    2024

    Grab

    1.56

    97.60

    0.06

    7.88

    0.25

    4.53

    M217573

    2025

    Channel

    4.27

    16.46

    0.00

    0.00

    0.00

    4.48

    M217643

    2025

    Channel

    4.35

    3.99

    0.01

    0.01

    0.04

    4.42

    M217608

    2025

    Channel

    4.35

    1.50

    0.00

    0.00

    0.01

    4.38

    D751406

    2025

    Grab

    4.07

    12.47

    0.00

    0.02

    0.05

    4.24

    M224868

    2025

    Grab

    0.38

    68.48

    3.42

    0.01

    0.15

    4.23

    M217805

    2025

    Channel

    4.18

    2.82

    0.00

    0.03

    0.01

    4.22

    D750088

    2024

    Grab

    0.16

    143.00

    0.04

    7.63

    1.50

    4.18

    M224938

    2025

    Grab

    0.00

    89.59

    3.15

    0.01

    1.15

    4.11

    D751417

    2025

    Grab

    3.38

    46.67

    0.00

    0.41

    0.00

    4.02

    M217637

    2025

    Channel

    3.63

    10.25

    0.03

    0.53

    0.59

    4.00

    D750664

    2024

    Float

    0.46

    292.00

    0.02

    4.51

    0.08

    3.99

    D750854

    2025

    Grab

    0.00

    186.00

    0.07

    7.28

    1.99

    3.95

    M224935

    2025

    Grab

    0.00

    271.00

    0.23

    1.45

    0.78

    3.91

    M224866

    2025

    Grab

    0.20

    146.00

    1.78

    0.04

    1.31

    3.85

    M224851

    2025

    Chip

    2.61

    38.00

    0.13

    1.99

    0.85

    3.70

    D751697

    2024

    Grab

    0.09

    105.00

    2.35

    0.01

    0.07

    3.65

    M220553

    2025

    Grab

    0.59

    200.00

    0.01

    3.58

    0.06

    3.61

    D751283

    2024

    Float

    0.26

    12.60

    3.02

    0.00

    0.00

    3.57

    D751946

    2024

    Grab

    0.02

    136.00

    0.72

    0.18

    4.35

    3.54

    D751699

    2024

    Grab

    2.15

    68.90

    0.01

    2.63

    0.06

    3.51

    D750751

    2025

    Grab

    1.16

    82.41

    0.03

    4.01

    2.80

    3.48

    M224904

    2025

    Grab

    1.04

    187.00

    0.00

    0.43

    0.17

    3.43

    D751195

    2024

    Channel

    1.61

    38.20

    0.82

    1.27

    0.71

    3.37

    D751398

    2025

    Grab

    0.09

    65.28

    2.01

    2.59

    1.34

    3.36

    D751436

    2025

    Grab

    0.14

    80.25

    0.09

    13.18

    0.20

    3.32

    D751394

    2025

    Grab

    0.24

    187.00

    0.16

    1.40

    1.42

    3.22

    D750554

    2024

    Channel

    0.05

    81.50

    0.35

    1.05

    5.34

    3.17

    D750199

    2024

    Grab

    0.15

    108.00

    0.01

    7.73

    0.05

    3.13

    D751836

    2024

    Chip

    0.22

    114.00

    0.00

    5.21

    1.59

    2.95

    D751845

    2024

    Chip

    2.63

    24.80

    0.00

    0.01

    0.00

    2.95

    D751972

    2024

    Channel

    1.42

    47.30

    0.03

    3.43

    0.68

    2.90

    D751846

    2024

    Grab

    2.59

    24.70

    0.01

    0.00

    0.00

    2.87

    D751207

    2024

    Grab

    0.04

    256.00

    0.01

    12.65

    0.01

    2.85

    M224963

    2025

    Grab

    2.63

    9.40

    0.09

    0.08

    0.01

    2.84

    M224855

    2025

    Grab

    2.23

    30.34

    0.03

    0.95

    0.20

    2.83

    M217727

    2025

    Channel

    2.73

    2.04

    0.01

    0.03

    0.01

    2.77

    D751109

    2024

    Grab

    1.65

    89.50

    0.10

    0.01

    0.03

    2.73

    D751962

    2024

    Grab

    0.55

    95.20

    0.26

    1.17

    1.98

    2.65

    D751404

    2025

    Grab

    2.61

    1.26

    0.00

    0.00

    0.00

    2.63

    M220555

    2025

    Grab

    0.09

    83.19

    0.04

    8.00

    0.64

    2.55

    D751968

    2024

    Grab

    1.49

    53.50

    0.01

    1.68

    0.13

    2.55

    D751153

    2024

    Grab

    0.83

    86.60

    0.38

    0.08

    1.16

    2.52

    M220674

    2025

    Grab

    0.00

    175.00

    0.01

    0.62

    0.74

    2.42

    D751213

    2024

    Float

    1.65

    51.40

    0.02

    0.31

    0.02

    2.41

    M224927

    2025

    Grab

    0.70

    40.80

    0.13

    6.73

    0.02

    2.37

    M217782

    2025

    Channel

    0.02

    88.40

    0.84

    0.78

    1.59

    2.32

    M224902

    2025

    Subcrop

    2.02

    10.72

    0.01

    0.90

    0.02

    2.31

    M220677

    2025

    Talus

    0.00

    29.29

    0.29

    0.29

    6.78

    2.26

    D751992

    2024

    Grab

    0.33

    102.00

    0.03

    3.27

    0.06

    2.21

    D750448

    2024

    Grab

    0.42

    71.70

    0.03

    4.57

    0.09

    2.20

    D751391

    2025

    Grab

    1.89

    14.34

    0.10

    0.24

    0.01

    2.19

    D751947

    2024

    Grab

    0.01

    74.70

    0.48

    0.09

    2.81

    2.16

    D750086

    2024

    Channel

    0.17

    17.30

    0.12

    1.11

    4.70

    2.16

    D751371

    2025

    Grab

    1.56

    39.69

    0.00

    0.20

    0.00

    2.08

    M224852

    2025

    Grab

    1.08

    50.66

    0.16

    0.93

    0.29

    2.05

    D750555

    2024

    Channel

    0.05

    73.10

    0.17

    1.03

    2.65

    2.03

    M217618

    2025

    Channel

    1.94

    6.23

    0.00

    0.00

    0.01

    2.02

    D750629

    2025

    Grab

    1.23

    39.89

    0.15

    0.00

    0.58

    1.99

    D751165

    2024

    Grab

    1.95

    6.80

    0.00

    0.01

    0.01

    1.99

    M217592

    2025

    Channel

    1.69

    10.63

    0.17

    0.02

    0.01

    1.97

    D750393

    2024

    Grab

    1.01

    41.30

    0.02

    1.79

    0.37

    1.97

    D750449

    2024

    Grab

    0.24

    32.60

    0.01

    6.38

    0.02

    1.96

    D751426

    2025

    Grab

    1.91

    1.49

    0.00

    0.00

    0.01

    1.94

    D751352

    2025

    Chip

    0.22

    41.10

    1.34

    0.01

    0.07

    1.91

    D751422

    2025

    Grab

    0.01

    41.14

    1.55

    0.01

    0.02

    1.86

    M217853

    2025

    Channel

    1.75

    2.88

    0.00

    0.02

    0.06

    1.81

    M217665

    2025

    Channel

    0.80

    43.76

    0.53

    0.00

    0.01

    1.80

    M224912

    2025

    Grab

    1.00

    64.20

    0.00

    0.01

    0.00

    1.78

    D751194

    2024

    Grab

    0.44

    130.00

    0.01

    0.08

    0.09

    1.74

    D750725

    2025

    Grab

    0.00

    62.49

    0.07

    4.77

    0.60

    1.71

    M224903

    2025

    Grab

    0.47

    39.05

    0.86

    0.01

    0.01

    1.70

    M217721

    2025

    Channel

    0.03

    53.49

    0.88

    0.46

    0.76

    1.70

    M220604

    2025

    Grab

    0.50

    29.35

    0.89

    0.30

    0.03

    1.69

    D751429

    2025

    Grab

    0.06

    73.61

    0.02

    2.36

    1.37

    1.67

    M224901

    2025

    Grab

    1.46

    12.66

    0.02

    0.22

    0.01

    1.66

    D750197

    2024

    Grab

    0.10

    95.80

    0.02

    1.43

    0.53

    1.66

    D750195

    2024

    Grab

    0.33

    15.30

    0.07

    2.21

    1.77

    1.60

    D750083

    2024

    Channel

    0.81

    32.70

    0.01

    1.63

    0.12

    1.57

    M217565

    2025

    Channel

    0.47

    12.27

    0.61

    0.04

    1.67

    1.56

    M217724

    2025

    Channel

    1.50

    2.88

    0.01

    0.06

    0.01

    1.55

    D750616

    2025

    Grab

    0.11

    64.83

    0.52

    0.35

    0.56

    1.54

    D751251

    2024

    Grab

    1.27

    11.10

    0.11

    0.02

    0.02

    1.53

    M217636

    2025

    Channel

    1.33

    12.99

    0.01

    0.07

    0.01

    1.52

    D750552

    2024

    Channel

    0.02

    33.00

    0.24

    0.04

    2.82

    1.51

    D751948

    2024

    Grab

    0.11

    53.10

    0.01

    3.48

    0.07

    1.49

    D751993

    2024

    Grab

    1.20

    11.90

    0.03

    0.35

    0.17

    1.48

    M224885

    2025

    Grab

    0.48

    14.86

    0.90

    0.00

    0.01

    1.45

    D751116

    2024

    Grab

    1.27

    13.20

    0.00

    0.01

    0.01

    1.44

    D750553

    2024

    Channel

    0.02

    25.10

    0.22

    0.06

    2.82

    1.42

    D751115

    2024

    Grab

    0.05

    45.10

    0.02

    0.95

    2.03

    1.40

    D751397

    2025

    Grab

    0.01

    26.13

    0.65

    0.05

    2.10

    1.40

    M224914

    2025

    Grab

    0.02

    49.81

    0.32

    1.61

    0.85

    1.36

    D750607

    2024

    Grab

    0.68

    43.40

    0.00

    0.75

    0.03

    1.36

    D751941

    2024

    Grab

    0.35

    26.00

    0.06

    0.64

    1.54

    1.34

    D750095

    2024

    Channel

    0.06

    52.40

    0.07

    1.56

    0.93

    1.32

    D750093

    2024

    Channel

    0.02

    43.70

    0.15

    0.65

    1.65

    1.31

    D751159

    2024

    Grab

    0.54

    29.00

    0.03

    1.93

    0.03

    1.31

    M217707

    2025

    Channel

    0.03

    35.15

    0.46

    1.41

    0.94

    1.30

    M217591

    2025

    Channel

    1.17

    3.78

    0.06

    0.04

    0.03

    1.28

    D751599

    2024

    Float

    0.05

    67.20

    0.02

    1.54

    0.23

    1.27

    M217625

    2025

    Channel

    0.35

    20.84

    0.55

    0.02

    0.61

    1.22

    M217673

    2025

    Channel

    0.07

    48.23

    0.03

    1.41

    1.35

    1.22

    M217626

    2025

    Channel

    0.84

    17.58

    0.18

    0.00

    0.02

    1.22

    M224854

    2025

    Grab

    0.95

    20.56

    0.05

    0.91

    0.24

    1.21

    D750706

    2025

    Float

    0.03

    86.21

    0.09

    0.10

    0.05

    1.18

    D750091

    2024

    Channel

    0.02

    56.00

    0.13

    0.07

    1.40

    1.18

    D751193

    2024

    Grab

    0.44

    20.60

    0.48

    0.01

    0.01

    1.17

    D750087

    2024

    Channel

    0.14

    37.00

    0.00

    1.49

    0.91

    1.15

    D751945

    2024

    Grab

    0.02

    27.30

    0.08

    1.53

    1.17

    1.13

    M217704

    2025

    Channel

    1.07

    1.61

    0.02

    0.01

    0.02

    1.11

    M224856

    2025

    Grab

    0.01

    18.03

    0.66

    0.02

    1.22

    1.10

    D750727

    2025

    Grab

    0.00

    28.20

    0.83

    0.00

    0.02

    1.07

    D751835

    2024

    Chip

    0.12

    25.20

    0.05

    1.76

    0.75

    1.05

    M224919

    2025

    Grab

    0.86

    8.94

    0.03

    0.17

    0.01

    1.03

    M217602

    2025

    Channel

    0.55

    25.19

    0.16

    0.03

    0.05

    1.02

    The Big One property is situated in a region that is well known for hosting Tier 1 precious metal and porphyry deposits, several of which occur near the property including the multiple porphyry systems at Galore Creek (12,159 million pounds of copper, 9.438 million ounces of gold, 174.086 million ounces of silver), the world’s largest known gold reserve at KSM (47.3 million ounces of gold, 160 million ounces of silver, 7.32 billion pounds of copper) and the polymetallic copper project at Shaft Creek (5 billion pounds of copper, 3.7 million ounces of gold, 16.4 million ounces of silver), as well as the Brucejack high-grade epithermal gold deposit (14 million ounces of gold, 91.8 million ounces of silver), and the structurally controlled high-grade hydrothermal gold-silver zones at Trophy and Sphal Creek. The property geology is favorable to host these types of deposits as confirmed by the presence of extensive areas of propylitic alteration, untested geophysical anomalies, strong silt, soil and rock geochemistry including path finder elements directly related to porphyry systems, key structures and textures, porphyry-style mineralization, and high-grade polymetallic veins, that have been discovered within the Big One claims.

    The Big One property can be accessed year-round via helicopter from the Glenora/Telegraph Creek Road at the Barrington Mine (33 km to the north-northeast) as well as the Galore Creek Road (15 km to the southeast). The Canadian government committed $20 M to extend/improve the Galore Creek Road to within 15 km of the Big One property. The property is 2 km west of the Scud River airstrip used in the early days of Galore Creek.

    The Big One property exploration qualifies for the Critical Mineral Exploration Tax Credit (CMETC).

    The Company would like to extend a special thanks to the Tahltan First Nation, the local community, and service providers for supporting our efforts and contributing to the success of this year’s program. We look forward to continuing to work with the Tahltan First Nation and all local stakeholders and businesses while we move forward to unlocking the full potential of this amazing new discovery. WORKING TOGETHER WE SUCCEED!

    About Juggernaut Exploration Ltd.

    Juggernaut Exploration Ltd. is an explorer and generator of precious metals projects in the prolific Golden Triangle of northwestern British Columbia. Its projects are in world-class geological settings and geopolitical safe jurisdictions amenable to Tier 1 mining in Canada. Juggernaut is a member and active supporter of CASERM, an organization representing a collaborative venture between the Colorado School of Mines and Virginia Tech. Juggernaut’s key strategic cornerstone shareholder is Crescat Capital.

    For more information, please contact:

    Juggernaut Exploration Ltd.

    Dan Stuart

    President and Chief Executive Officer

    Tel: (604)-559-8028

    www.juggernautexploration.com

    Follow us on LinkedIn: Click Here
    Follow us on Facebook:
    Click Here
    Follow us on X / Twitter:
    Click Here
    Follow us on YouTube:
    Click Here

    Qualified Person

    Rein Turna, P. Geo, is the qualified person as defined by National Instrument 43-101, for Juggernaut Exploration projects, and supervised the preparation of, and has reviewed and approved, the technical information in this release.

    Other

    The reader is cautioned that grab samples are spot samples which are typically, but not exclusively, constrained to mineralization. Grab samples are selective in nature and collected to determine the presence or absence of mineralization and are not intended to be representative of the material sampled.

    Grab, channels, chip and talus samples were collected by foot with helicopter assistance. Prospective areas included, but were not limited to, proximity to MINFile locations, placer creek occurrences, regional soil anomalies, and potential gossans based on high-resolution satellite imagery. The rock grab and chip samples were extracted using a rock hammer, or hammer and chisel to expose fresh surfaces and to liberate a sample of anywhere between 0.5 to 5.0 kilograms. All sample sites were flagged with biodegradable flagging tape and marked with the sample number. All sample sites were recorded using hand-held GPS units (accuracy 3-10 meters) and sample ID, easting, northing, elevation, type of sample (outcrop, subcrop, float, talus, chip, grab, etc.) and a description of the rock were recorded on all-weather paper. Samples are then inserted in a clean plastic bag with a sample tag for transport and shipping to the geochemistry lab. QA/QC samples including blanks, certified reference materials, and duplicate samples are inserted regularly into the sample sequence at a rate of 10%.

    All samples are transported in rice bags sealed with numbered security tags. The rice bags are transported from the core shacks to the MSALABS facilities in Terrace, BC. MSALABS is certified with both AC89-IAS and ISO/IEC Standard 17025:2017. The core samples undergo preparation via drying, crushing to ~70% of the material passing a 2 mm sieve and riffle splitting. The sample splits are weighed and transferred into three plastic jars, each containing between 300 g and 500 g of crushed sample material. A 250 g split is pulverized to ensure at least 85% of the material passes through a 75 µm sieve. The crushed samples are transported to the MSALABS PhotonAssayTM facility in Prince George, where gold concentrations are quantified via photon assay analysis (method CPA-Au1). Samples that result in gold concentrations ≥5 ppm are analyzed to extinction. Photon assay uses high-energy X-rays (photons) to excite atomic nuclei within the jarred samples, inducing the emission of secondary gamma rays, which are measured to quantify gold concentrations. The assays from all jars are combined on a weight-averaged basis. Multielement analyses are carried at the MSALABS facilities in Surrey, BC, where 250 g of pulverized splits are analyzed via ICF6xx and IMS-230 methods. The IMS-230 method uses 4-acid digestion (a combination of hydrochloric, nitric, perchloric and hydrofluoric acids) followed by inductively coupled plasma emission spectrometry to quantify concentrations of 48 elements. Samples with over-limit results for Ag, Cu, Pb and Zn undergo ore-grade analysis via the ICF-6xx method (where ‘xx’ denotes the target metal). This method employs 4-acid digestion followed by inductively coupled plasma emission spectrometry.

    FORWARD LOOKING STATEMENT

    Certain disclosures in this release may constitute forward-looking statements that are subject to numerous risks and uncertainties relating to Juggernaut’s operations that may cause future results to differ materially from those expressed or implied by those forward-looking statements, including its ability to complete the contemplated private placement. Readers are cautioned not to place undue reliance on these statements.

    NOT FOR DISSEMINATION IN THE UNITED STATES OR TO U.S. PERSONS OR FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES. THIS PRESS RELEASE DOES NOT CONSTITUTE AN OFFER TO SELL OR AN INVITATION TO PURCHASE ANY SECURITIES DESCRIBED IN it.

    NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

    Copyright (c) 2025 TheNewswire – All rights reserved.

    News Provided by TheNewsWire via QuoteMedia

    This post appeared first on investingnews.com

    Previous Article
    • Investing

    Upcoming Meeting Dates – November 10, 2025

    • November 10, 2025
    View Post
    Next Article
    • Latest News

    Trump pardons Rudy Giuliani, Mark Meadows, Sidney Powell, others involved in 2020 election interference saga

    • November 10, 2025
    View Post
    Enter Your Information Below To Receive Trading Ideas and Latest News

      Your information is secure and your privacy is protected. By opting in you agree to receive emails from us. Remember that you can opt-out any time, we hate spam too!
      Popular Topics
      • In a SNAP, Trump blamed for blocking food assistance to low-income families
      • Questcorp Mining Provides Clarification on Private Placement Investment
      • Trump pardons Rudy Giuliani, Mark Meadows, Sidney Powell, others involved in 2020 election interference saga
      • About us
      • Contacts
      • Privacy Policy
      • Terms and Conditions
      • Email Whitelisting

      Input your search keywords and press Enter.